This project was very challenging having had to partially design the levels based on the concept design provided while taking into consideration the existing permanent structures. Scope of work included all external works ranging from sandstone retaining block wall, timber decking, stairs, pathways, automatic irrigation, play surfaces such as softball (both rubber and organic mulch), play equipment, and soft landscaping including the hydro mulched turfing.
Within a short span of 4 weeks, our team was able to transform the architect’s vision into reality, excelling the client’s expectations.
| Industry Sector: | Commercial Landscape |
| Client: | Reitsma Construction Pty Ltd |
| Time frame: | 4 weeks |
| Year: | 2020 |